Pads, Strips, Pile Caps And Basement Footings

Concrete Footings Brisbane

Engineered footings for commercial builds, tilt panel structures, columns and basement carparks, poured to drawing and documented for your certifier.

The One You Cannot Redo

Everything Above It Depends On This Pour

Concrete footings Brisbane projects are built on are the one element nobody can go back and fix. Once the structure is up, a footing that was short on cover, out of position, or poured on unsuitable material stays that way. The remedy always costs more than doing it right.

That is why footing work is really documentation work. The pour itself is a morning. The value sits in accurate set out, steel fixed to schedule, the hold point signed off, and the paperwork that proves it.

We work to your engineer’s drawings for builders, developers and project managers, from single pad footings through to full basement works.

Pad footings set out and reinforced across a commercial site in Brisbane

Footing Types

What We Pour

Different structures load the ground in different ways. The type follows the design, the geotechnical report and what the site will actually give you.

  • Pad footings

    Isolated pads under columns and posts, sized and reinforced to the point loads coming down from the frame.

  • Strip footings

    Continuous footings under load bearing and blockwork walls, stepped where the site falls away.

  • Pile caps

    Caps tying piled foundations into the structure, with starter bars set for columns and blade walls.

  • Ground beams

    Beams spanning between pads or piles, carrying wall and slab loads across softer ground.

  • Tilt panel footings

    Footings and starter details set for panel erection, with tolerances that suit the crane day.

  • Column and blade wall bases

    Bases poured with cast in plates, bolts and dowels located to the shop drawings.

  • Lift and stair core footings

    Heavier, more congested pours where reinforcement detail and access both need planning.

  • Basement and carpark footings

    Footings poured below ground level alongside shoring, drainage and waterproofing trades.

  • Plant and machinery bases

    Bases for tanks, switchrooms, compactors and equipment, with vibration and holding down details cast in.

At ground level

Footings For Buildings And Structures

Warehouses, retail, childcare, medical fitouts and light industrial. The work is mostly about set out accuracy and keeping the steel program ahead of the concrete program.

  • Set out from survey marks, not from a tape off a fence
  • Reinforcement fixed to schedule with cover checked
  • Cast in items located and braced before the pour
  • Stepped footings where the site grades away
  • Staged pours that suit a live trade sequence

Below ground

Basements And Underground Carparks

Digging below ground brings water, neighbours and other trades into the job. The footing is the easy part once access, shoring and dewatering are sorted.

  • Working alongside shoring, piling and anchor crews
  • Dewatering and pump out planned before the dig
  • Acid sulfate soils identified early in low lying areas
  • Waterproofing and drainage interfaces coordinated
  • Concrete placed by pump or line where trucks cannot reach

Documented Work

Engineered Footings

On commercial footings, the certificate matters as much as the concrete. Here is how the process usually runs, and where we sit in it.

  1. The design belongs to an engineer.

    Structural footings are designed by an RPEQ engineer, and we build to that drawing rather than substituting our own detail.

  2. Form 15 and Form 16 carry the certification.

    Form 15 covers design compliance and Form 16 covers inspection and aspect certification, with your building certifier deciding what is required.

  3. Hold points come before concrete, not after.

    Reinforcement, cover and position get inspected while everything is still visible, and we book that in rather than chasing it.

  4. Materials are specified, not assumed.

    AS 3600 covers concrete structures, AS 1379 covers the supply of the concrete, and AS 4671 covers the reinforcing steel.

  5. Licensing applies from a low threshold.

    Building work valued over $3,300 in Queensland needs a QBCC licensed contractor, counting labour, materials and GST across the whole project.

  6. Ground conditions carry their own obligations.

    Acid sulfate soils occur in low lying river and bayside areas, and disturbing them brings specific handling and disposal requirements.

Reinforced concrete footing prepared for a retaining wall at a Brisbane home

On Site Sequence

Concrete Footing Process

Nothing here is unusual. It only goes wrong when a step gets compressed to protect a date, which is normally the inspection.

  • Locate and set out

    Utility searches, potholing where needed, set out from survey marks.

  • Excavate

    Dig to design level, batter or shore, and remove unsuitable material.

  • Fix steel

    Cages and mesh fixed to schedule, cover and cast in items checked.

  • Inspect and pour

    Hold point signed off, then place, vibrate and take test samples.

  • Cure and backfill

    Cure, strip forms, backfill and hand the area to the next trade.

Concrete keeps gaining strength out to around 28 days, so early loading limits are set by the engineer rather than by how solid it looks.

Let us Build Your Next Project

Get a no obligation, fixed fee quote. We visit your site, look at the job properly and give you a price you can rely on.

Scroll to Top